The Concrete Protector
Step 1 — Configure

Project Setup

Define the job scope, crew, and equipment. Everything flows from here.

Project Inputs
Project Bid
$50,000.00
20,000 sq ft × $2.50 / sq ft
Crew
Machine & Equipment
Setup 1× WE-2795 Leonidas
Recommended Crew 3 men
Material Cost
Man-Hours
Est. Job Days
Net Profit
Step 2 — Chemicals

Chemicals & Liquids

Toggle items on/off. Adjust add-on quantities and unit costs as needed.

🧪 Chemical Products
Item Coverage Qty Needed Add On Unit Cost Material Cost $/SqFt
📐 Linear Joint Fill Calculator MPP Joint 80
0.00 gallons
0.00 quarts · 0 cu in · 0.000 cu ft
+ 10% waste = 0.00 gallons to order
Material Cost: $0.00
Step 3 — Tooling

Tools & Abrasives

Select the tool grits for your polishing process. Add custom items below.

🔧 Tool Selection
Item Coverage Qty Needed Add On Unit Cost Material Cost $/SqFt
Other Items
Step 4 — Ordering

Quantity to Order by Tool System

Select your tool system below. Order quantities rounded up by tool system ceiling.

📦 Order Quantities
Item Qty Needed Order Qty
📐 Joint Fill — Order Summary
Linear Feet
Fill Needed
Waste %
Total to Order
Material Cost
Step 5 — Project Estimate

Profit & Loss Statement

Full project estimate based on your selected machine, crew, and materials.

Revenue
Total COGS
Labor Cost
Net Profit
Net Margin
💰 Project Estimate — WE-2795 Leonidas
Revenue (Project Bid)
Chemical Materials
Tool & Abrasive Materials
Joint Fill (MPP)
Other Items
Total COGS
Gross Profit on Materials
 Machine
 Total Machine Hours (all tool steps)
Runtime per Machine
 Machine Utilization
 Productive Hours / Day
 Est. Calendar Days
 Recommended Crew (1 machine)
 Actual Crew
 Calendar Hours on Site
 Man-Hours (3 crew × calendar hrs)
Total Labor Cost
Net Profit
Net Margin
Profit / Sq Ft
Est. Job Duration
📋 Step-by-Step Breakdown — 1× WE-2795 Leonidas
Step 6 — Advanced

Variable Inputs

Adjust production rates and tool coverage to match your real-world conditions. All changes flow through machine hours, labor cost, tool quantities, and P&L instantly.

Machine Production Rates (sqft / machine hour per step)
🔧 Tool Material Coverage (sqft per physical tool)